Concrete Treatments Beneath Floor Coverings

Website

Why you need a concrete moisture treatment beneath floor coverings.

Moisture migration in concrete causes serious issues under direct-stick floor coverings. 

Did you know - That concrete dries at about 25mm thickness per month?

With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.

This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.

Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.

What does this mean for you?

  • No program delays during construction! Save time and hassle.
  • Practical insurance against flooring failures due to moisture. 
  • Avoid unexpected costs on end-of-project moisture barriers. 
  • Save costs and time with curing and moisture control in one treatment. 
  • One company, one warranty, for curing, sealing and moisture barrier

Why choose hydrogel treatments beneath floor coverings?

  • Minimal downtime – Treated concrete can be trafficked 1 hour following application. Floor coverings can be installed 3 days later on existing concrete and 28 days on new concrete 
  • Less risk - minimise the risk of floor coverings detaching 
  • Offers the added benefit of curing enhancement, if applied early. Save time and money! 
  • Compatible with ALL adhesives, coatings and epoxies designed for bare concrete 
  • Moisture control - Complies with the moisture control requirements of AS3799 
  • Nil VOC and water-based - environment and occupant friendly, sustainable 
  • Warranty - 15-year Markam performance warranty

Our concrete treatment system is -

Designed to Suit:

  • Retail stores with resilient floor coverings 
  • Schools and colleges with carpet and vinyl 
  • Commercial office spaces with carpet and vinyl 
  • Sports facilities with resilient rubber sports flooring (including outdoor facilities)

This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.

Created to Help:

  • Architects looking for a proven system that works, and no repercussions from flooring failures 
  • Engineers looking for long term durability 
  • Developers looking for efficient and cost-effective construction processes 
  • Construction teams, contractors, and flooring installers looking to save time and money on their construction programme 
  • Asset owners looking for long term trouble-free property management
Visit company website
Request price / brochure
Downloads
Contact the supplier

Also from MARKHAM

Done tagging
Full screen

Concrete Treatments Beneath Floor Coverings

Why you need a concrete moisture treatment beneath floor coverings.

Moisture migration in concrete causes serious issues under direct-stick floor coverings. 

Did you know - That concrete dries at about 25mm thickness per month?

With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.

This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.

Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.

What does this mean for you?

  • No program delays during construction! Save time and hassle.
  • Practical insurance against flooring failures due to moisture. 
  • Avoid unexpected costs on end-of-project moisture barriers. 
  • Save costs and time with curing and moisture control in one treatment. 
  • One company, one warranty, for curing, sealing and moisture barrier

Why choose hydrogel treatments beneath floor coverings?

  • Minimal downtime – Treated concrete can be trafficked 1 hour following application. Floor coverings can be installed 3 days later on existing concrete and 28 days on new concrete 
  • Less risk - minimise the risk of floor coverings detaching 
  • Offers the added benefit of curing enhancement, if applied early. Save time and money! 
  • Compatible with ALL adhesives, coatings and epoxies designed for bare concrete 
  • Moisture control - Complies with the moisture control requirements of AS3799 
  • Nil VOC and water-based - environment and occupant friendly, sustainable 
  • Warranty - 15-year Markam performance warranty

Our concrete treatment system is -

Designed to Suit:

  • Retail stores with resilient floor coverings 
  • Schools and colleges with carpet and vinyl 
  • Commercial office spaces with carpet and vinyl 
  • Sports facilities with resilient rubber sports flooring (including outdoor facilities)

This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.

Created to Help:

  • Architects looking for a proven system that works, and no repercussions from flooring failures 
  • Engineers looking for long term durability 
  • Developers looking for efficient and cost-effective construction processes 
  • Construction teams, contractors, and flooring installers looking to save time and money on their construction programme 
  • Asset owners looking for long term trouble-free property management
Visit company website
Request price / brochure
Downloads
Contact the supplier

Also from MARKHAM

Done tagging
Full screen

Concrete Treatments Beneath Floor Coverings

Why you need a concrete moisture treatment beneath floor coverings.

Moisture migration in concrete causes serious issues under direct-stick floor coverings. 

Did you know - That concrete dries at about 25mm thickness per month?

With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.

This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.

Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.

What does this mean for you?

  • No program delays during construction! Save time and hassle.
  • Practical insurance against flooring failures due to moisture. 
  • Avoid unexpected costs on end-of-project moisture barriers. 
  • Save costs and time with curing and moisture control in one treatment. 
  • One company, one warranty, for curing, sealing and moisture barrier

Why choose hydrogel treatments beneath floor coverings?

  • Minimal downtime – Treated concrete can be trafficked 1 hour following application. Floor coverings can be installed 3 days later on existing concrete and 28 days on new concrete 
  • Less risk - minimise the risk of floor coverings detaching 
  • Offers the added benefit of curing enhancement, if applied early. Save time and money! 
  • Compatible with ALL adhesives, coatings and epoxies designed for bare concrete 
  • Moisture control - Complies with the moisture control requirements of AS3799 
  • Nil VOC and water-based - environment and occupant friendly, sustainable 
  • Warranty - 15-year Markam performance warranty

Our concrete treatment system is -

Designed to Suit:

  • Retail stores with resilient floor coverings 
  • Schools and colleges with carpet and vinyl 
  • Commercial office spaces with carpet and vinyl 
  • Sports facilities with resilient rubber sports flooring (including outdoor facilities)

This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.

Created to Help:

  • Architects looking for a proven system that works, and no repercussions from flooring failures 
  • Engineers looking for long term durability 
  • Developers looking for efficient and cost-effective construction processes 
  • Construction teams, contractors, and flooring installers looking to save time and money on their construction programme 
  • Asset owners looking for long term trouble-free property management