Why you need a concrete moisture treatment beneath floor coverings.
Moisture migration in concrete causes serious issues under direct-stick floor coverings.
Did you know - That concrete dries at about 25mm thickness per month?
With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.
This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.
Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.
What does this mean for you?
Why choose hydrogel treatments beneath floor coverings?
Our concrete treatment system is -
Designed to Suit:
This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.
Created to Help:
Why you need a concrete moisture treatment beneath floor coverings.
Moisture migration in concrete causes serious issues under direct-stick floor coverings.
Did you know - That concrete dries at about 25mm thickness per month?
With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.
This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.
Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.
What does this mean for you?
Why choose hydrogel treatments beneath floor coverings?
Our concrete treatment system is -
Designed to Suit:
This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.
Created to Help:
Why you need a concrete moisture treatment beneath floor coverings.
Moisture migration in concrete causes serious issues under direct-stick floor coverings.
Did you know - That concrete dries at about 25mm thickness per month?
With construction schedules under ever-increasing pressure, concrete curing may not be fully complete when it’s time for the floor coverings to be laid. If the slab is exposed to rain during construction, this will extend the risk of moisture remaining in the slab.
This means that moisture may still migrate up through the slab after floor coverings are laid. Moisture can interact with adhesives, or cause moisture vapour bubbling under resilient floor coverings.
Markham’s concrete solutions beneath floor coverings can prevent these issues occurring.
What does this mean for you?
Why choose hydrogel treatments beneath floor coverings?
Our concrete treatment system is -
Designed to Suit:
This system is best applied at the curing stage, for maximum benefits. However, it can be applied 3 days before the installation of floor coverings. Also suitable for moisture control under genuine timber flooring.
Created to Help: