5 Foot Plug and Play Hot tub on Drilled Steel Piles - Colonial Hot Tubs | ArchiPro

5 Foot Plug and Play Hot tub on Drilled Steel Piles

Website

The customer was looking for a solution that didn't require hard landscaping and generated the least amount of disruption to the surrounding garden. The galvanized steel piles were drilled into the ground in a few hours and we built the tub on top of the piles. The site was beyond crane access and closed off from the road, an on-site build was the only option. The tub is equipped with ozone gas to reduce sanitation and wifi control to make running the tub from any location simple and easy. 

Visit professional's website
Enquire about the process / fees
Contact details
simple access to promote tubbing. 
minimal disruption to site. 

Products in this project

Professionals used on this project

Also from Colonial Hot Tubs

Done tagging
All
Projects
Products
Professionals
Articles

5 Foot Plug and Play Hot tub on Drilled Steel Piles

The customer was looking for a solution that didn't require hard landscaping and generated the least amount of disruption to the surrounding garden. The galvanized steel piles were drilled into the ground in a few hours and we built the tub on top of the piles. The site was beyond crane access and closed off from the road, an on-site build was the only option. The tub is equipped with ozone gas to reduce sanitation and wifi control to make running the tub from any location simple and easy. 

Visit professional's website
Enquire about the process / fees
Contact details
simple access to promote tubbing. 
minimal disruption to site. 

Products in this project

Professionals used on this project

Also from Colonial Hot Tubs

Done tagging
All
Projects
Products
Professionals
Articles

5 Foot Plug and Play Hot tub on Drilled Steel Piles

The customer was looking for a solution that didn't require hard landscaping and generated the least amount of disruption to the surrounding garden. The galvanized steel piles were drilled into the ground in a few hours and we built the tub on top of the piles. The site was beyond crane access and closed off from the road, an on-site build was the only option. The tub is equipped with ozone gas to reduce sanitation and wifi control to make running the tub from any location simple and easy. 

Visit professional's website
Enquire about the process / fees
Contact details
simple access to promote tubbing. 
minimal disruption to site. 

Professionals used on this project

Done tagging