banner

An existing Warehouse with several internal annexes converted into operational Meat Processing Facility including high care zones, temperature-controlled environment, internal gantry crane, blast freezer, piped services, electrical upgrade, automated doors and bulk storage freezer space.

Staged over 2 phases to suit the client’s requirements with respect to processing commencing prior to storage being required and to facilitate the dynamic design process.

QCC were able to engage with the client to establish their specific requirements with respect to Staging of the works and in conjunction with the consultants prioritise design input so as to ensure the project met the necessary timelines.

Close coordination and cooperation with separate contractors ensured that the handover for the various spaces were completed on time.       

Get in touch
Visit Website

Professionals used in
Bidfood Morin Road

About the
Professional

THIS IS US: Q CONSTRUCTION

Our experience in the industry told us clients were looking for people they can trust. People who have pride in seeing a job done well and last, but not least – people they enjoyed working with.

We also figured that if we’re going put our sweat and hours into a project, we may as well enjoy it. The happier, healthier our crew – the better the end result, for everyone.

We call this “The Power of Q” and it’s so powerful, clients want to come back, again and again.

No us and them.

No matter how large or how small your project, we believe in total collaboration. Construction is one of the most complicated industries with so many moving parts, so there has to be teamwork and a good measure of ingenuity. We create solutions that work, bring innovation that saves money, and have a can-do attitude that gets the job done on time.

CONSTRUCTION 

INTERIORS 

MAINTENANCE 

COLDSTORES