Groundscrew Foundations for Maungawhau Boardwalk

By Stop Digging

Profile
Groundscrew Foundations for Maungawhau Boardwalk banner

The new boardwalk is the next step in the preservation of Maungawhau, Mt Eden. One of the most iconic and culturally important landmarks in Tāmaki Makaurau has a new feature. By subtly blending materials into the volcanic crater rim draws a physical connection to our relationship with the land and environment. 

Isthmus Group Ltd - Design/ Architecture
Stellar Projects Ltd - Engineering Design and Project Management
HEB Construction - Builders

Thanks for the enquiry, please let us know your location and we will ask our local region partner to contact you!

Products used in
Groundscrew Foundations for Maungawhau Boardwalk

Professionals used in
Groundscrew Foundations for Maungawhau Boardwalk

About the
Professional

Groundscrews allow installation of a pile foundation in a fraction of the time it takes with other piling methods.

How do you use our Groundscrews?  

Our CodeMark certification allows a simple design process for building consent.

They are an anchor pile to NZ3604. Standard subfloor design is all that is required. For projects outside of 3604, we have multiple design options for cantilever piles, and spot footings with load bearing capacity up to around 150kN, and larger by special order.

We provide a full specification and installation service, including site specific static pile testing, reports and CodeMark declaration for Building Consent.

For large scale developments, small one off houses and decks, or civil engineering projects, especially in areas with sensitive environmental considerations or limited access, the use of StopDigging! groundscrews will massively impact your construction timeline - for the better:

No spoil / mess to clear up.

No excavation inspections.

No weather delays.

Zero construction waste for foundations.

Lower carbon footprint than concrete.

Contact us for project specific information and advice!