Kapiti – Waikanae Central

Website

eHaus Euro - PHI Low Energy Standard - Non Certified

This a small but perfectly formed eHaus is nestled in a private retreat away from the business of life. It has all you need including 3 bedrooms and an amazing private outdoor area linking directly to the internal living space. With all of the normal eHaus features and some extras this home has a very light footprint on the planet and generates most of the electricity that is needed to run the home through the year. 

“From the time we had our kick off meeting …. About 20th March…basically we came out of Consent on the 21st of July, so been a four month process. Working together between the design and the builder and ourselves, very tightly together, has been the right way to go” Robin

 

Design Components:

Floor – Fully insulated concrete pad with a U-value of 0.184 W/(m²K)

Wall – 140mm timber frame with service cavity U-value of 0.223 W/(m²K)

Roof – Double layer of fibreglass insulation U-value of 0.138 W/(m²K)

Window Joinery Frame – Advanced Windows NZ- uPVC – Uf value 1.50 W/(m²K)

Glazing – Double glazed Argon Ug value = 1.1 W/(m²K) g-value = 61%

Ventilation – Zehnder Comfo Air 350 LH MHRV

Hot Water – Bosch Compress 3000 – 270L capacity hot water heat pump

Heating/Cooling – DF 960 Gas fire. Under tile heating mat on ensuite and bathroom

Power generation – 3 kW Solar PV system

 

Performance Specifications:

Heating demand 24.0 kWh/m2/yr

Heating load: 15.1 W/m2

Frequency of Overheating 1%

TFA: 125.97 m2

Form Factor: 3.93

Air leakage@50Pa: 0.80 ACH

PER demand: 33 kWh/m2/y

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from eHaus

Show more categories!
Done tagging
Full screen

Kapiti – Waikanae Central

eHaus Euro - PHI Low Energy Standard - Non Certified

This a small but perfectly formed eHaus is nestled in a private retreat away from the business of life. It has all you need including 3 bedrooms and an amazing private outdoor area linking directly to the internal living space. With all of the normal eHaus features and some extras this home has a very light footprint on the planet and generates most of the electricity that is needed to run the home through the year. 

“From the time we had our kick off meeting …. About 20th March…basically we came out of Consent on the 21st of July, so been a four month process. Working together between the design and the builder and ourselves, very tightly together, has been the right way to go” Robin

 

Design Components:

Floor – Fully insulated concrete pad with a U-value of 0.184 W/(m²K)

Wall – 140mm timber frame with service cavity U-value of 0.223 W/(m²K)

Roof – Double layer of fibreglass insulation U-value of 0.138 W/(m²K)

Window Joinery Frame – Advanced Windows NZ- uPVC – Uf value 1.50 W/(m²K)

Glazing – Double glazed Argon Ug value = 1.1 W/(m²K) g-value = 61%

Ventilation – Zehnder Comfo Air 350 LH MHRV

Hot Water – Bosch Compress 3000 – 270L capacity hot water heat pump

Heating/Cooling – DF 960 Gas fire. Under tile heating mat on ensuite and bathroom

Power generation – 3 kW Solar PV system

 

Performance Specifications:

Heating demand 24.0 kWh/m2/yr

Heating load: 15.1 W/m2

Frequency of Overheating 1%

TFA: 125.97 m2

Form Factor: 3.93

Air leakage@50Pa: 0.80 ACH

PER demand: 33 kWh/m2/y

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from eHaus

Show more categories!
Done tagging
Full screen

Kapiti – Waikanae Central

eHaus Euro - PHI Low Energy Standard - Non Certified

This a small but perfectly formed eHaus is nestled in a private retreat away from the business of life. It has all you need including 3 bedrooms and an amazing private outdoor area linking directly to the internal living space. With all of the normal eHaus features and some extras this home has a very light footprint on the planet and generates most of the electricity that is needed to run the home through the year. 

“From the time we had our kick off meeting …. About 20th March…basically we came out of Consent on the 21st of July, so been a four month process. Working together between the design and the builder and ourselves, very tightly together, has been the right way to go” Robin

 

Design Components:

Floor – Fully insulated concrete pad with a U-value of 0.184 W/(m²K)

Wall – 140mm timber frame with service cavity U-value of 0.223 W/(m²K)

Roof – Double layer of fibreglass insulation U-value of 0.138 W/(m²K)

Window Joinery Frame – Advanced Windows NZ- uPVC – Uf value 1.50 W/(m²K)

Glazing – Double glazed Argon Ug value = 1.1 W/(m²K) g-value = 61%

Ventilation – Zehnder Comfo Air 350 LH MHRV

Hot Water – Bosch Compress 3000 – 270L capacity hot water heat pump

Heating/Cooling – DF 960 Gas fire. Under tile heating mat on ensuite and bathroom

Power generation – 3 kW Solar PV system

 

Performance Specifications:

Heating demand 24.0 kWh/m2/yr

Heating load: 15.1 W/m2

Frequency of Overheating 1%

TFA: 125.97 m2

Form Factor: 3.93

Air leakage@50Pa: 0.80 ACH

PER demand: 33 kWh/m2/y

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Done tagging
Full screen