Morere SH2 Culvert Repair

Morere SH2 Culvert Repair

Currie Construction

Currie Construction logo
Visit Website
After the flooding caused by cyclone gabrielle, a slip blocked a culvert positioned 12 metres beneath the road. Read more
Visit Website

Emergency culvert replacement on SH2 following Cyclone Gabrielle, ensuring road safety near Mōrere Hot Springs through effective collaboration and swift execution by Quality Roading and partners.

After the flooding caused by cyclone gabrielle, a slip blocked a culvert positioned 12 metres beneath the road. This meant a watercourse above the highway near the famed Mōrere Hot Springs was filling up with water, running over the road at an already fragile fill area and putting the road at risk of being washed out entirely.

Despite the team pumping water 24-7 to take the pressure off and minimise damage to the road, an emergency culvert replacement was the only way to take away the risk of the road being washed away at the next downpour, at a time when the earth was still moving.

The project had to be done in just two days of road closure. Delivering it on time needed great collaboration between Waka Kotahi NZ Transport Agency, Quality Roading and Solutions, Currie Construction, and the project subcontractors to be a success.

Completed
2023
Client
Quality Roading
0h 13m

Like this Project?
Hire Currie Construction

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Bushy Knoll Anchored Steel Retaining Wall