Built-in 2017 in Dubai as part of Dubai’s 2030 plan to 3D Print 25% of all buildings by 2030. It is also the first building to be 3D Printed in the Middle East.

Our job: Engineering, construction

Printing time: 46 elements in 3 weeks

Customer Demand

It was April 2016, when Sheikh Mohammed Bin Rashid Al Maktoum shared his vision to print up to 25% of buildings by 2030 in Dubai. An ambitious and progressive goal. As a result, DEWA (Dubai Electricity and Water Authority) indicated in the Laboratory for Drones (R&D Drone) at the Solar Parc. This laboratory will conduct research on drones and 3D printing technologies and is based at the Solar Park as a part of its Research and Development (R&D) Centre. It had to be built by means of 3D Concrete Printing. This demand can be seen as the first open tender in which 3D printing has been named as a mandatory construction method. It was their wish to print directly on-site including an iconic design.

The Activities

The R&D Drone Laboratory was delivered in the second quarter of 2017. CyBe was responsible as a subcontractor for the engineering and construction of the 3D Printing works in the building. Because of the size of the elements of the R&D Drone Laboratory, we used our mobile printer: the CyBe RC 3Dp. Together with the team of printing engineers, the printer was transported to the location in Dubai to print the elements on site. Therefore we were able to fulfil the wish of printing on-site.

What We’ve Learned

Before printing this project, all the prints had been done in a controlled environment. Within this project, we experienced very hot temperatures of higher than 40 degrees Celsius. In addition, we noticed that tests told us that CyBe MORTAR would be reaching final setting time in five minutes. We experience that people trust on standards too many times, without checking side information. Besides, we found out how to ensure to fall within local regulations and building codes. Think of building up the design – when the client requested a bigger floor area we only needed to adjust the parameters instead of re-designing. Cheap and very efficient.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from QOROX®

Done tagging
Full screen

R & Drone

Built-in 2017 in Dubai as part of Dubai’s 2030 plan to 3D Print 25% of all buildings by 2030. It is also the first building to be 3D Printed in the Middle East.

Our job: Engineering, construction

Printing time: 46 elements in 3 weeks

Customer Demand

It was April 2016, when Sheikh Mohammed Bin Rashid Al Maktoum shared his vision to print up to 25% of buildings by 2030 in Dubai. An ambitious and progressive goal. As a result, DEWA (Dubai Electricity and Water Authority) indicated in the Laboratory for Drones (R&D Drone) at the Solar Parc. This laboratory will conduct research on drones and 3D printing technologies and is based at the Solar Park as a part of its Research and Development (R&D) Centre. It had to be built by means of 3D Concrete Printing. This demand can be seen as the first open tender in which 3D printing has been named as a mandatory construction method. It was their wish to print directly on-site including an iconic design.

The Activities

The R&D Drone Laboratory was delivered in the second quarter of 2017. CyBe was responsible as a subcontractor for the engineering and construction of the 3D Printing works in the building. Because of the size of the elements of the R&D Drone Laboratory, we used our mobile printer: the CyBe RC 3Dp. Together with the team of printing engineers, the printer was transported to the location in Dubai to print the elements on site. Therefore we were able to fulfil the wish of printing on-site.

What We’ve Learned

Before printing this project, all the prints had been done in a controlled environment. Within this project, we experienced very hot temperatures of higher than 40 degrees Celsius. In addition, we noticed that tests told us that CyBe MORTAR would be reaching final setting time in five minutes. We experience that people trust on standards too many times, without checking side information. Besides, we found out how to ensure to fall within local regulations and building codes. Think of building up the design – when the client requested a bigger floor area we only needed to adjust the parameters instead of re-designing. Cheap and very efficient.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from QOROX®

Done tagging
Full screen

R & Drone

Built-in 2017 in Dubai as part of Dubai’s 2030 plan to 3D Print 25% of all buildings by 2030. It is also the first building to be 3D Printed in the Middle East.

Our job: Engineering, construction

Printing time: 46 elements in 3 weeks

Customer Demand

It was April 2016, when Sheikh Mohammed Bin Rashid Al Maktoum shared his vision to print up to 25% of buildings by 2030 in Dubai. An ambitious and progressive goal. As a result, DEWA (Dubai Electricity and Water Authority) indicated in the Laboratory for Drones (R&D Drone) at the Solar Parc. This laboratory will conduct research on drones and 3D printing technologies and is based at the Solar Park as a part of its Research and Development (R&D) Centre. It had to be built by means of 3D Concrete Printing. This demand can be seen as the first open tender in which 3D printing has been named as a mandatory construction method. It was their wish to print directly on-site including an iconic design.

The Activities

The R&D Drone Laboratory was delivered in the second quarter of 2017. CyBe was responsible as a subcontractor for the engineering and construction of the 3D Printing works in the building. Because of the size of the elements of the R&D Drone Laboratory, we used our mobile printer: the CyBe RC 3Dp. Together with the team of printing engineers, the printer was transported to the location in Dubai to print the elements on site. Therefore we were able to fulfil the wish of printing on-site.

What We’ve Learned

Before printing this project, all the prints had been done in a controlled environment. Within this project, we experienced very hot temperatures of higher than 40 degrees Celsius. In addition, we noticed that tests told us that CyBe MORTAR would be reaching final setting time in five minutes. We experience that people trust on standards too many times, without checking side information. Besides, we found out how to ensure to fall within local regulations and building codes. Think of building up the design – when the client requested a bigger floor area we only needed to adjust the parameters instead of re-designing. Cheap and very efficient.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Done tagging
Full screen