Project team
Unitec Tranche I encompasses the $23m CET building for Trades education and the $19m Hub project, featuring innovative structural engineering and architectural design, including a glulaminated diagrid roof and seismic isolation, recognized with multiple industry awards.
The Tranche 1 projects are the first Stage in many proposed stages on the Unitec campus redevelopment as part of the pedagogical transformation. The $23m CET building is a large format single storey long span structure to house Trades education spaces, and includes large mezzanine structures and part basement. The CET building is futureproofed for a 4 storey Performing and Screen Arts (PaSA) building oversailing the Trades structure. The $19m Hub project is a highly complex structural engineering and architectural challenge, incorporating a steel collar jointed 2 storey sway frame structure with tree columns supporting a glulaminated diagrid roof. The structure also incorporates intricate 4 storey high, 2m thick wing walls. The entire structure oversails, and is seismically isolated from, the surrounding existing buildings.
Hub and CET Projects – Merit Winners – Property Council New Zealand Property Industry Awards
Hub Project Gold Winner – Master Builders New Zealand Commercial Project Awards
Like this Project?
Hire Structus
Professional Reviews
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Structus
Other work by Structus, across every category they build in.
More in
Renders
Everything else in Renders, from every practice on ArchiPro.
Next Project
Keep scrolling














