Skip to main content

Bridgestone Wanaka

Bridgestone Wanaka

Calder Group

Calder Group logo
  • 3.3K profile views
Visit Website
A vertically integrated design, manufacture and build project in the heart of Three Parks Wanaka, managed by Calder Group from concept to completion. Read more
Visit Website

A vertically integrated design, manufacture and build project in the heart of Three Parks Wanaka, managed by Calder Group from concept to completion.

The architecturally designed (in-house) workshop and office space includes a three-bay workshop equipped with vehicle servicing hoists recessed below the floor, adjacent to the workshop are two storage areas fitted with roller doors at either end to allow for easy delivery of tyres and to minimise disruption to the workshop.

Our client wanted an elevated look and feel to a standard tyre centre, this was executed through the cedar exterior weatherboards that provide a bold colour contrast between the iron cladding and exterior building colour. The curved coloursteel tray parapets provide a softened edge to the building roofline inspired by the art deco era curved building facades that also follows the curvature of the street.

Completed
2025
0h 2m

Like this Project?
Hire Calder Group

Professional Reviews

“Having a local company with everything under one roof from design to manufacturing provided a seamless and streamlined build within budget and to a tight timeframe. The quality of work was outstanding, as was their attentiveness, attitude and performance.”

Dave Gellatly (Director) – Roofing Industries

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Mainstream Freight Group