Skip to main content

DSM Waka Milk Powder Line

DSM Waka Milk Powder Line

Q Construction

Q Construction logo
  • 58.0K profile views
  • 18 saves
Visit Website
This project was to upgrade and refurbish the added value milk-powder line at DSM's processing plant in Henderson, West Auckland. Read more
Visit Website

Upgrade and refurbishment of DSM's milk powder line in Henderson, featuring the construction of high-care hygiene rooms for infant formula processing, completed safely and efficiently within a live food-processing environment.

This project was to upgrade and refurbish the added value milk-powder line at DSM's processing plant in Henderson, West Auckland.

Working with WorleyParsons (now known as Worley), we provided demolition and building services over 12 weeks to create five new hygiene rooms in which infant milk formula products would be processed and packed.

How we made a difference

  • Accomplished demolition and construction work safely, cleanly and efficiently within the live environment of DSM’s Henderson food-processing plant
  • Supported the project’s overall targets by working cooperatively alongside other, separate contractors and subcontractors on a relatively small and busy work site
  • Complied comprehensively with the client’s strict health and safety requirements to achieve the desired result of zero harm incidents
  • Co-operative building team contributes

The details

Our Q Commercial Construction team demolished walls, ceilings, floors, and specialist doors in the existing plant before beginning the layout reconfiguration and construction of the high-care, high-hygiene rooms. Conductive floors were among the technical features of this refurbishment and were important to protect the plant’s people, materials, and sensitive equipment from electrostatic discharges.

This work included a revised wall layout, new specialist doors, and new, specialized floor finishes. Providing for new drainage points and hot and cold water feeds to repositioned hand wash basins were part of the work.

We engaged a specialist flooring subcontractor to install the conductive flooring and supervised extensive quality testing throughout its application to ensure that it would perform as specified.

5270h 31m

Like this Project?
Hire Q Construction

Professional Reviews

1 / 6

“We were lucky enough to be introduced to Tony Eastland and the Q Construction team in relation to our project to build clubrooms at the Waitakere Regional Hockey Turf. The assistance provided by Tony and his team was, from day one, outstanding with the Q team providing quality advice and introductions that helped the Trust Board through the project to deliver the outcome we were seeking and basically within our budget. David King and his construction team were professional, helpful and patient as we worked through the construction process to deliver a quality club rooms to support all the groups that utilise the Turf and its support facilities.”

Bryan DaviesWaitakere Hockey Pavilion, Henderson

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Thomas Road Childcare Center