Construction of boat stacking facility at Mount Wellington for the original owners RPM Property. Read more
Visit Website

Project team

Construction of a multi-tier dry stack boat storage facility at Mount Wellington, featuring reinforced concrete foundations, a galvanised steel frame, and comprehensive stormwater management solutions.

Construction of boat stacking facility at Mount Wellington for the original owners RPM Property.

We were engaged following the abandonment of contract works by other parties. As the site was established by Q and as part of our ‘as built’ surveys the works previously completed works were found to be non-compliant. In conjunction with our subcontractors we were able to formulate a method of removing all pre-existing works that minimised the significant time/cost implication of this error by other parties.

The challenge

With the site located on a historic volcanic plateau and close proximity to the mean high-water mark there was extensive basalt and other volcanic material that required breaking along with very high water tables that all dictated a very detailed methodology with respect to constructing the foundations including hydro excavation, rock breaker. The site had also been used to place non engineered fill to fill between the peaks of basalt. Extremely deep foundations spanning full width of the site also determined specific sequencing of works so works could progress in a manner where access was maintained for ALL effected parties.

The steel frame supply was by a nominated contractor and Q Construction were charged with sourcing suitably qualified steel assembly crews ‘untangling’ the web of supply information left over by previous contractors.

Due to the very high loadings imposed by the equipment associated with the facility usage a robust process was implemented to find a workable solution for a floor slab that was founded on unsuitable subgrade and needed to be self supporting between the foundation beam spans. QCC engaged their preferred contractor for this form of slab and were able to formulate a slab design that met all the necessary requirements.

The details

  • Multi-Tier Dry Stack Boat Storage Facility
  • Reinforced concrete foundations
  • Galvanised steel frame
  • Design and Build floor slab
  • Associated stormwater/wastewater management devices
  • Dockside modifications including new ramp and concrete block gravity retaining wall
6907h 17m

Like this Project?
Hire Q Construction

Professional Reviews

1 / 6

“We were lucky enough to be introduced to Tony Eastland and the Q Construction team in relation to our project to build clubrooms at the Waitakere Regional Hockey Turf. The assistance provided by Tony and his team was, from day one, outstanding with the Q team providing quality advice and introductions that helped the Trust Board through the project to deliver the outcome we were seeking and basically within our budget. David King and his construction team were professional, helpful and patient as we worked through the construction process to deliver a quality club rooms to support all the groups that utilise the Turf and its support facilities.”

Bryan DaviesWaitakere Hockey Pavilion, Henderson

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
19 Timberly - Auckland Airport