Skip to main content

Veterinary Clinics

Veterinary clinics are designed for animal care and clinical work. Clinic projects can include treatment and consultation spaces.

Can't find it? Describe what you need and matching suppliers will come to you.

Veterinary Clinics

Nothing matches those filters

Try widening one of them, or start again with the whole category.

Clear filters

More to discover

Explore all project categories


About Veterinary Clinics projects

Planning veterinary clinics in New Zealand starts with the practice’s services and the equipment each room must accommodate. Published projects on this page include Warkworth Vets by Customkit Buildings and Cambridge Vets by DLA Architects. A workable brief accounts for animal handling as well as staff movement: an examination table needs clear space around it, while recovery accommodation needs supervision without exposure to a busy waiting area. Equipment dimensions and door clearances should be established before room sizes are fixed.

Veterinary Clinics

Animal welfare and daycare also feature in the project selection, represented by SPCA & Doggy Daycare Hobsonville by Altro. These uses bring particular requirements for holding areas and noise control. Acoustic separation deserves attention early, since barking can carry between enclosures and into client spaces. Ventilation needs to suit occupancy and cleaning routines; washable surfaces alone do not resolve odour or moisture. Locating cleaning storage close to the rooms it serves helps keep supplies out of public circulation.

How much space should a clinic waiting area allow?

Base the layout on peak appointment overlap, allowing room to keep animals apart without blocking reception or accessible routes. Include space for carriers beside seating rather than in circulation paths.

Which finishes suit treatment rooms?

Specify floors and wall finishes that tolerate the practice’s disinfectants and cleaning frequency. Check slip resistance and junction details, particularly where floors meet walls or fixed joinery.

What needs checking before converting an existing building?

Have the design team assess drainage and ventilation capacity before committing to a room layout. Confirm consent and change-of-use requirements with the council, including accessibility and fire safety.