Skip to main content

ANZ (Triangle Building)

ANZ (Triangle Building)

Woods Glass

Woods Glass logo
  • 360.4K profile views
  • 64 saves
Visit Website
LOCATION: Christchurch CONSTRUCTION COMPANY: Leighs Construction ARCHITECT / DESIGNER: Peddlethorp Architects COMPLETED: 2017 The ANZ Centre is the first permanent shopping centre to open after the Christchurch earthquakes and is in the heart of the CBD. Read more
Visit Website

ANZ Centre: Christchurch's first permanent shopping centre post-earthquake, featuring innovative glass structures and completed on schedule by Leighs Construction and Peddlethorp Architects in 2017.

LOCATION: Christchurch
CONSTRUCTION COMPANY: Leighs Construction
ARCHITECT / DESIGNER: Peddlethorp Architects
COMPLETED: 2017

The ANZ Centre is the first permanent shopping centre to open after the Christchurch earthquakes and is in the heart of the CBD.

This iconic building was finished to the original program due to our ability to procure the material early and utilizing our vast range of machines with world class operators to achieve a great result for Leighs Construction and the client.

Woods Glass was involved in many elements of this project from 4 sided structural curtain wall panels glazed in-house to a full perimeter under-slung glass canopy on spider fittings to the double height frame-less wall on the Glassons shop.

The ground floor being fully site glazed by our expert site glaziers, over 400 spider fittings site welded to the canopy, the largest canopy panel weighing 650kg.

1.2K3h 18m

Like this Project?
Hire Woods Glass

The products behind the project

Two products specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Next Project

Keep scrolling
B405 | University of Auckland Engineering