Detailed seismic assessment of the Mt Albert Pedestrian Bridge, lift tower, and external concrete stair, completed by NZCEL for Auckland Transport, ensuring compliance with current seismic guidelines.
Detailed seismic assessment (DSA) of three connected structures consisting of a pedestrian bridge, a lift tower and an external concrete stair were completed by NZCEL for Auckland Transport. Each building was modelled separately in ETABS and the %NBS of the structures were then calculated following the current seismic guidelines.
- Completed
- 2023
- Client
- Auckland Transport