National Mini Storage Extension

Website

Atlas Concrete supplied over 1200 cubic meters for a large extension to the National Mini Storage units in Albany.  There were a number of mixes involved for different purposes; from foundations, to suspended floor slabs (which were pumped from the ground up to the second and third floors), to driveway concrete and general site-works.  Atlas also worked with the client to design and produce a special pumpable mix to suit their specific requirements relating to  shrinkage cracking reduction.

Atlas also supplied the concrete that went into the construction of the original building and site-works eight years prior.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from Atlas Concrete

Show more categories!
Done tagging
Full screen

National Mini Storage Extension

Atlas Concrete supplied over 1200 cubic meters for a large extension to the National Mini Storage units in Albany.  There were a number of mixes involved for different purposes; from foundations, to suspended floor slabs (which were pumped from the ground up to the second and third floors), to driveway concrete and general site-works.  Atlas also worked with the client to design and produce a special pumpable mix to suit their specific requirements relating to  shrinkage cracking reduction.

Atlas also supplied the concrete that went into the construction of the original building and site-works eight years prior.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from Atlas Concrete

Show more categories!
Done tagging
Full screen

National Mini Storage Extension

Atlas Concrete supplied over 1200 cubic meters for a large extension to the National Mini Storage units in Albany.  There were a number of mixes involved for different purposes; from foundations, to suspended floor slabs (which were pumped from the ground up to the second and third floors), to driveway concrete and general site-works.  Atlas also worked with the client to design and produce a special pumpable mix to suit their specific requirements relating to  shrinkage cracking reduction.

Atlas also supplied the concrete that went into the construction of the original building and site-works eight years prior.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Done tagging
Full screen