South Metropolitan TAFE

South Metropolitan TAFE banner
About

No project details available for this project.
Request more information from this professional.

Winners of multiple AIA awards, Armstrong Parkin Architects designed the new building and collaborated with builders EMCO to bring their artistic vision to life. The result – a striking façade made of fibre reinforced concrete screen panels that draws intrigue to the building with its modern edge and sophisticated structure.

Inside, the building houses training and administration facilities including eight salons, a gymnasium, simulated office, library, café, student amenities and services areas. There are also specialist training facilities including a virtual nursery and playgroup, computer laboratories and learning areas.

It was a joy dealing with Studco’s engineering team as well as other team members here in WA. George Yang Topend Ceilings Manager

Having worked on previous education buildings including Harrisdale Senior High School, Perth Library and Joseph Banks Secondary School; contractors Topend Ceilings were enlisted on the project for their reputation of having a keen eye for detail and high-quality workmanship.

Calling on their extensive experience and knowledge, Topend Ceilings are well-versed in uplift forces, caused by a gust of wind entering an enclosed space and forcing the ceiling to rise and fall, with the potential to collapse an entire ceiling. Amid concerns regarding uplift forces that may result from the protruding façade, Topend Ceiling’s preference was to utilize PGI Droppers in place of traditional rods and clips to provide the additional support required. They contacted their distribution partner Planet Plasterboard, who engaged Studco Building Systems® as their supplier of choice to provide an engineered solution for the steel wall studs and concealed ceiling systems in the building.

Studco's Concealed Suspended Ceiling Systems were installed throughout the campus.

Studco’s engineering team worked closely with Topend Ceilings to ensure the ceiling framing system put forward would be the ideal solution for the build and were readily available to answer any questions or concerns to ensure Topend Ceilings were able to complete the framing without complications. Studco® worked to make sure Topend Ceilings and Planet Plasterboard could achieve their desired result and be industry leaders that can provide a competitive edge and quality finish. Studco’s service guarantee ensured they had a team of engineers, account managers and customer service team available to answer any queries on design requirements.

IMG20171114091158.jpg
IMG20171114090838.jpg

About the
Professional

Why ArchiPro?

No more endless searching -

Everything you need, all in one place.

Real projects, real experts -

Work with vetted architects, designers, and suppliers.

Designed for New Zealand -

Projects, products, and professionals that meet local standards.

From inspiration to reality -

Find your style and connect with the experts behind it.

Start your Project

Start you project with a free account to unlock features designed to help you simplify your building project.

Learn More

Become a Pro

Showcase your business on ArchiPro and join industry leading brands showcasing their products and expertise.

Learn More
EZ Concept
EZ Concept

Manufacturers and Suppliers