Court Theatre Case Study

25 June 2024

 • 

5 min read

banner
The Court Theatre project is an excellent example of a hybrid structure, seamlessly integrating steel, concrete, and mass timber to optimize structural integrity. Given the use of multiple materials, a meticulous shop drawing process was essential. Red Stag TimberLab, Offsite Design, Hawkins Construction, and Kobe Construction collaborated closely throughout this phase to refine Design for Manufacture and Assembly (DfMA) principles.
Court-Theatre-Images.png
Red-Stag-Sustainability.png
Red-Stag-Gallery.png
Red-Stag-Gallery-2.png
Red-Stag-Conclusion.png