Skip to main content

Auckland Airport Hub

Auckland Airport Hub

Horizon International Paving

Horizon International Paving logo
  • 171.7K profile views
  • 30 saves
Visit Website
Auckland Airport’s international terminal transport system is set for the biggest change in its nearly 50-year history with the opening of the Transport Hub ground floor on Wednesday 3 April. Read more
Visit Website

Auckland Airport's Transport Hub transforms the international terminal experience with a new 14,000m2 ground floor, featuring dedicated lanes for public and commercial traffic, enhancing efficiency and accessibility for travelers, set to open in 2024.

Auckland Airport’s international terminal transport system is set for the biggest change in its nearly 50-year history with the opening of the Transport Hub ground floor on Wednesday 3 April.

From 2am that morning, travellers heading for the international terminal will be the first to experience the brand-new facility when they pull up to more than 320m of new undercover kerbside drop off and pick up – a 200 per cent boost in space on what’s currently available out front of the terminal. Construction continues with parking levels above opening late-2024.

Replacing the old 1977 international terminal ground-level car park, the ground floor of the Transport Hub covers over 14,000m2 with separate lanes for public and commercial traffic creating an efficient and modern arrival and departure experience for those using public transport and scheduled buses, being dropped off or picked up by friends and family, or being dropped off by taxis, rideshares and shuttles.

As per Isthmus “Laid across the east plaza, welcoming people on arrival, is a generous whāriki that reminds us that we are entering Māori whenua that is rich in history and whakapapa. It is a symbol of manaakitanga for Te Ākitai Waiohua and Te Ahiwaru Waiohua to welcome manuhiri into Tāmaki Makaurau and Aotearoa. The whāriki pattern has been developed from the two traditional patterns of Aramoana and Pātiki and is supported by six Turuturu, weaving pegs, vertical elements located at key points related to entry and exit and the conceptual corners of the whāriki”.

Completed
2024
2791h 4m

Professional Reviews

1 / 4

“Thanks for supplying a great product. We couldn’t fault the quality of the pavers. The clients are really pleased with the overall result and the job looks fantastic!”

Blair = Dig Landscape Design

The products behind the project

One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Massey Albany Campus