Rendezvous Hotel - Christchurch

The Rendezvous Hotel is a 23 level, 171 unit hotel and apartment building standing as tallest building the South Island at 86m.
Services director Mike Baker was responsible for the hydraulic services including the first bespoke aerator stack system installed in NZ. This significantly reduced venting and saved construction time and cost by significantly reducing fire and acoustic treatment. The hydraulic systems remained undamaged during the earthquakes.
No project details available for this project.
Request more information from this professional.


Professionals used in Rendezvous Hotel - Christchurch
More projects by TM Consultants Ltd
About the
Professional
We are your award-winning, one-stop-shop collaborative team of 75 Christchurch, Auckland and Queenstown based engineers. Let’s bring your vision to life. We sweat the small stuff (so you don’t have to). We specialise in delivering successful projects on time and on a budget.
A practical approach to sustainable engineering design.
- Exploring and providing design options with innovation, rather than a single solution each time
- The full 3D BIM modelling package
- Coordination and project control from start to finish
- Year founded2010
- ArchiPro Member since2021
- Follow
- Locations
- More information
Why ArchiPro?
No more endless searching -
Everything you need, all in one place.Real projects, real experts -
Work with vetted architects, designers, and suppliers.Designed for New Zealand -
Projects, products, and professionals that meet local standards.From inspiration to reality -
Find your style and connect with the experts behind it.Start your Project
Start you project with a free account to unlock features designed to help you simplify your building project.
Learn MoreBecome a Pro
Showcase your business on ArchiPro and join industry leading brands showcasing their products and expertise.
Learn More