Skip to main content

Heritage Villa

Heritage Villa

Division Building

Division Building logo
  • 2.7K profile views
This project was a large-scale renovation over 15 months consisting of excavating the 80 m2 basement, adding a rear mid floor extension with a pool and going up the third level all while retaining the middle floor press steel ceilings and natural heritage of the original building. Read more

A meticulous 15-month renovation of a heritage villa, featuring an 80 m² basement excavation, a rear mid-floor extension with a pool, and the addition of a third level, all while preserving the original building's press steel ceilings and natural heritage.

This project was a large-scale renovation over 15 months consisting of excavating the 80 m2  basement,  adding a rear mid floor extension with a pool and going up the third level all while retaining the middle floor press steel ceilings and natural heritage of the original building. 

Photo Credit - Barfoot & Thompson Remuera

3901h 23m

Like this Project?
Hire Division Building

Professional Reviews

1 / 3

“We contracted Division Building Ltd for a major renovation of our 1930’s era house including an extension. We found Leon and his team great to work with delivering excellent build quality. Leon is great at listening to ideas as well as suggesting changes to details which improved the look and living spaces of the finished house. There were a number of surprises in the old house during the build but working with Leon we were able to stay within our budget and we are very happy with the overall outcome. We have before and after photos that might illustrate the build better than a reference. If you tie your website into LinkedIn I can provide my reference that way gives more authenticity.”

Nigel and Beata Stus-Greig