Skip to main content

Tiled Shower Design: Choices That Move the Waterproofing

featuring Superior Renovations

Written by Swati Tiwary

Featuring Superior Renovations

Published


Superior Renovations logo
  • 199.0K profile views
  • 115 saves

A door, a curtain or nothing at all: each tiled shower design choice changes where the waterproofing membrane has to go. Here is how to plan it before anyone tiles.

Featured Professionals

Written by

  • Swati Tiwary

Every tiled shower design choice you make at the drawing stage tells the waterproofer where the membrane has to go. Take the door off the shower and the membrane spreads further across the floor. Swap a fixed rose for a hand shower on a hose and it spreads again. Put the mixer on a different wall, add a niche, choose a floor-standing vanity over a wall-hung one, and each decision adds a junction, a penetration or another square metre of waterproofing that has to be done right.

None of that shows once the tiles are on. That is exactly why it belongs in the design conversation, not the build. The figures below come from the Waterproofing Membrane Association's Code of Practice for Internal Wet Area Membrane Systems, the industry document MBIE adopted as acceptable solution E3/AS2. They explain why two showers that look similar in a photo can carry very different waterproofing scopes. For the compliance side, who is allowed to apply a membrane and how it gets checked, read Superior Renovations' guide to who applies bathroom waterproofing and who checks it.

Tiled Shower Design Starts With the Enclosure: Screen, Curtain or Open

The single biggest design decision for waterproofing is how you close off the shower. The Code of Practice ties the horizontal extent of the wall membrane directly to it.

  • Fixed screen or door: the membrane runs to the line of the screen or door.
  • Shower curtain: the membrane runs at least 300 mm beyond the line of the curtain.
  • Open shower with a fixed rose: the membrane runs 1,500 mm beyond the rose.
  • Open shower with a hand-held rose: the membrane runs 600 mm beyond the length of the hand shower, so a longer hose means a wider zone.

Put a hand shower on a 1.5 m hose in an open shower and the zone runs 2.1 m out: 1.5 m of hose plus 600 mm. Whoever holds it can point water anywhere it reaches, and the rule follows the water.

Why an open shower asks more of the floor

The floor follows the same logic. The Code of Practice asks for a positive fall to the outlet, with 1:50 given as a reasonable allowance for deflection and tolerances in most construction. Where there is no wall, screen, door or curtain, that fall has to apply across a 1.5 m radius measured from a point directly below the rose. On a compact Auckland bathroom footprint, 1.5 m can be most of the room.

This is where an open shower turns into a wet room in all but name. If that is the look you want, how Superior Renovations designs a shower and builds the waterproofing behind it is the place to start, because the floor build-up has to be planned before the framing is touched.

The doorless compromise

A single fixed glass panel with no door sits between the two. In the larger of the Torbay ensuites where we took the shower door away, the bath and the open shower share one wet area behind a single sheet of frameless glass. Cici Zuo, who designed it, explains the thinking.

We took the door off the shower and ran a single sheet of frameless glass, so the eye carries straight through to the far wall. In a wet area, that's what makes a bathroom feel bigger than its actual footprint.

Cici Zuo, Lead Consultant and Designer, Superior Renovations

The trade-off is honest: a doorless panel opens more of the room to splash, so the membrane and the floor falls have to cover more ground than a fully enclosed shower would need. Our case study on that job is candid about it. Take the door off and the whole corner of the room becomes the splash zone.

How High the Waterproofing Goes, and Why the Rose Height Matters

Inside the shower, the Code of Practice sets the wall membrane at the higher of 1,800 mm above the shower floor or 300 mm above the shower rose. Any enclosure, whether a wall, screen, door or curtain, has to run from floor level (or the top of the hob) to at least that same height.

That is stricter than the E3/AS1 minimum our waterproofing guide quotes, which is 1,800 mm or 50 mm above the rose. The Code of Practice says plainly that its extents can exceed the Building Code minimum and are considered good practice, and it is the document a supplier-certified applicator works to.

So a ceiling-mounted rain head changes more than the look. If the rose sits at 2,200 mm, the membrane goes to at least 2,500 mm. In a room with a 2.4 m stud, that is close to the full wall height inside the shower, and under the Code of Practice the screen has to reach 2,500 mm as well, so check the panel height against it. Settle the rose position before anyone prices the glass.

The mixer wall and every pipe through it

Wall-mounted mixers, spouts and roses are penetrations, and the Code of Practice treats them carefully. Wherever a pipe or water supply passes through a wall, the membrane has to extend at least 150 mm beyond that point. Valves and rose fittings inside a membrane-protected shower wall need a proprietary flange that traps any leak and sends it out the front of the flange, down the wall lining. That detail also has to allow a plumber to change washers or ceramic discs later without damaging the lining or the membrane.

Level, BRANZ's homeowner site, puts the design principle plainly: drawings should specify minimum penetrations through the waterproofing and the sealing of every one. Fewer holes, fewer weak points. If you can put the mixer and the rose on the same wall, do it.

Order of work matters as much as position

The Code of Practice says every pipe, sleeve, duct and vent should be installed and fixed before the membrane goes on. If a penetration is made, moved or altered afterwards, the membrane has to be reapplied around it. In plain terms, changing your mind about the mixer height once the waterproofer has been through costs a return visit and a fresh section of membrane, plus the cure time that comes with it.

Hob, Step-Down or Flush: The Threshold Decision

The Code of Practice leaves the height of any hob or step-down to the design, and says showers intended for people with disabilities should have a flush threshold. What it does set is how a hob has to behave with the screen on top of it.

  • With a rigid screen or door on a hob, the screen sits at the inside edge of the hob.
  • If the base of that screen stops water crossing, the top of the hob slopes away from the screen.
  • In every other case (a screen that lets water past, a curtain, or an open shower) the top of the hob slopes back into the shower.
  • The top edges of the hob are chamfered or rounded by 10 mm by 10 mm.

Water should run off the hob and back into the shower, never pond against the bottom of the glass. Level adds that hobs should be built from material that moisture doesn't affect, not timber, with the membrane carried over the top. Level also notes that leaks are commonly traced to floor-to-wall and hob-to-wall junctions and around drains, which is why a hob is a detail to draw, not one to leave to the day.

Why the screen fixings deserve a line on the drawing

Frameless glass on a hob or a floor is fixed with channels, clamps or brackets, and every fixing near the membrane is a potential way in for water. The Code of Practice maintenance checklist asks the owner to check any mechanical fastening of shower screens and doors for moisture ingress points. Its section on timber floor finishes is blunter still: no mechanical fixings that penetrate the membrane. Agree the glass fixing method with the glazier and the waterproofer before tiling, so the fixings land where the membrane detail expects them.

Niches, Benches and Shelves: Every Corner Is a Junction

A recessed niche keeps bottles off the floor without a caddy hanging off the mixer. But a niche is a box cut into a waterproofed wall, which gives the membrane four extra internal corners, four external edges and a sill that collects water.

Where the membrane supplier's instructions call for it, the Code of Practice asks for internal corners to get a treated timber fillet or a 10 mm sealant fillet, so the membrane can turn the corner without cracking. A niche multiplies those corners. It also changes the framing, so its position has to be decided before the wall is lined, not chosen on site from whatever stud spacing turns up.

Niche design rules worth following

  • Keep the niche off the wet wall where possible. A niche on the wall the rose sprays directly at gets the most water.
  • Slope the sill. A level niche floor holds a puddle; a slight fall towards the shower lets it drain.
  • Size it to the tile. A niche sized to whole tiles avoids slivers of cut tile and extra grout lines at the corners.
  • Don't put it in an external wall without checking. Cutting into insulation and an external wall cavity needs the designer and builder to agree the detail first.

The smaller of our Torbay ensuites shows how this plays out. With no room for a bath, it got a custom diamond-shaped shower tucked into the corner with a tiled storage niche built into the wall, using the same 600 mm by 600 mm matte porcelain as the larger room.

Built-in seats and ledges

A tiled bench or ledge in the shower is, from the membrane's point of view, another hob inside the shower. The same principles apply: a moisture-resistant core rather than timber, the membrane carried over the top and down the face, and a fall on the top so water runs back to the floor rather than sitting on it.

Vanity, Bath and Heating: Design Calls Outside the Shower

Shower design gets most of the attention, but the rest of the room carries membrane decisions too. The Code of Practice asks for the membrane to extend up the wall behind every fixture with a water supply and at least 150 mm beyond its top edge and each side. Where no fixture applies, the floor membrane turns up the wall by at least 75 mm. In an enclosed bathroom, it covers the entire floor and stops at a water-stop across the doorway.

Wall-hung or floor-standing vanity

A wall-hung vanity is the easier one for waterproofing. The Code of Practice says sealant is not needed along the bottom edge of wall-mounted fixtures that don't reach the floor, although the membrane must still run up the wall behind them. A floor-standing vanity has to have the junction between the membrane and its base sealed. That's one more sealant line to maintain, in the spot where a mop and a wet bath mat end up.

Baths with a rim set into the wall

Some baths and shower trays have a rim designed to sit recessed into the wall structure. The Code of Practice says a membrane system is not practical with these, because it can't easily be made continuous behind the recessed rim. The answer is an acrylic liner, a self-finished sheet lining, or a sheet lining with a secondary membrane, packed off the membrane-treated wall. It's not a reason to rule the bath out. It is a reason to check the product drawing before the bath is ordered.

Underfloor heating

Heated tiles look like a simple add-on. They aren't, as far as the membrane is concerned. As our waterproofing guide notes, E3/AS2 excludes membranes installed with underfloor heating or sound insulation layers, so the heating, the membrane and the floor build-up have to be specified together as one system. Level adds a detail most people never think about: the cable entry points for under-tile heating should sit above the flood level. Both Torbay ensuites have underfloor heating under the tiles.

What These Design Choices Do to Cost and Programme

We don't price waterproofing on its own, because it never happens on its own: it comes with the strip-out, any floor repairs, the plumbing and the tiling. Our FAQ puts it this way: anything that touches the layout, framing or waterproofing membrane lands in the $25,000 to $35,000 +GST range, which is where most Auckland bathroom renovations end up. As our Torbay case study puts it, an open wet area with frameless glass and underfloor heating costs more than a straight like-for-like refit, because the glass and the waterproofing detailing behind it carry much of the spend.

The bigger cost risk is changing your mind late. A moved mixer or a niche added after waterproofing means reapplying membrane, waiting for it to cure, and often another council inspection before tiling. The cheapest version of each of these decisions is the one made on paper.

If you want a number for your own room, put your shower layout into our bathroom cost calculator and you'll get an Auckland price range by email.

When the old shower is the reason you're renovating

A lot of Auckland bathroom projects start with a problem, not a mood board. The Massey bathroom renovation that started with a leak is a good example. The main bathroom in that West Auckland home was small and badly laid out, and a bulky acrylic shower made it feel smaller still. Dorothy Li reworked the layout and we built a custom tiled shower with clear glass in its place.

In a small bathroom, the enclosure is usually what's eating the space. Building the shower in and glazing it with clear panels lets the eye carry through, so the whole room feels larger without us touching a single wall.

Dorothy Li, Lead Designer, Superior Renovations

One caution from the Code of Practice applies to every retrofit like this: you can't add a proper membrane behind a vanity, bath or tray that stays in place. Built-in fixtures have to come out so the membrane can run continuously under and behind them. If someone offers to waterproof around the existing fittings, ask how.

A Design Checklist to Take to Your First Meeting

You don't need to know membrane classes or cure times to design a good shower. You do need to answer a handful of questions early, because each answer moves the membrane.

  1. Will the shower have a door, a fixed panel, a curtain, or nothing at all?
  2. Fixed rose, hand shower, or both? How long is the hose?
  3. How high is the rose, and is it on the ceiling?
  4. Hob, step-down or flush threshold, and what sits on top of it?
  5. Where do the mixer and rose go, and can they share one wall?
  6. How many niches or ledges, on which wall, and at what height?
  7. Wall-hung or floor-standing vanity? Does the bath have a recessed rim?
  8. Heated floor or not?

Bring those answers to our showroom at 16B Link Drive, Wairau Valley, and the design team can show you how each choice looks and what it does to the waterproofing scope. More of our bathroom work is on superiorrenovations.co.nz.

A note on consent: a new tiled shower is usually consented work in New Zealand, because the membrane is. This article is design guidance, not consent advice. Check your own project with Auckland Council or a Licensed Building Practitioner, and read Sonder Architecture's explainer on when a tiled shower needs building consent.

Frequently Asked Questions

How far does waterproofing go in an open shower with no screen?

Under the WMAI Code of Practice, the wall membrane in an open shower runs 1,500 mm beyond a fixed shower rose, or 600 mm beyond the length of a hand-held shower. The floor fall to the waste also has to cover a 1.5 m radius from below the rose. That's why open showers need more membrane than enclosed ones.

How high should shower waterproofing go?

The Code of Practice sets the shower wall membrane at the higher of 1,800 mm above the shower floor or 300 mm above the shower rose. A ceiling-mounted rain head can push it to full wall height. Any screen or enclosure must reach the same minimum height from the floor or the top of the hob.

Do shower niches cause leaks?

Not if they are designed and detailed properly, but each niche adds internal corners, external edges and a sill that the membrane has to turn without a break. Decide the niche position before the wall is lined, keep it off the wall the rose sprays at, slope the sill, and size it to whole tiles.

Is a wall-hung vanity better for waterproofing?

It is simpler. The Code of Practice says the bottom edge of a wall-mounted fixture that doesn't reach the floor needs no sealant, though the membrane still runs up the wall behind it. A floor-standing vanity needs the junction between its base and the membrane sealed, which adds one more joint to maintain.

Can I add underfloor heating under a tiled shower floor?

Yes, but plan it at design stage. E3/AS2 excludes membranes installed with underfloor heating, so the heating, membrane and floor build-up must be specified as one system by the designer and installers. Level recommends cable entry points for under-tile heating sit above the flood level.

Good shower design and good waterproofing are the same conversation, held early. If you're planning a new tiled shower, book a free consultation and bring a sketch of the shower you have in mind, and we'll show you where the membrane goes before anything is built.

References

  1. Waterproofing Membrane Association, Code of Practice for Internal Wet Area Membrane Systems, 4th edition (February 2020)
  2. Level (BRANZ), Waterproofing tiled showers