Skip to main content

Opito Sands Balustrades

Opito Sands Balustrades

UNEX Systems

UNEX Systems logo
  • 353.9K profile views
  • 47 saves
Visit Website
The Kaireka Holiday Home at Opito Sands, built by HAMR Homes with Whiti Design, is a two-level retreat on the Coromandel coastline with cedar and Hardie Stria cladding, four bedrooms, and high-end interior finishes. Read more
Visit Website

Project team

Product Suppliers

Face-fixed framed glass balustrades built for salt air and coastal wind, without giving up the ocean view.

The Kaireka Holiday Home at Opito Sands, built by HAMR Homes with Whiti Design, is a two-level retreat on the Coromandel coastline with cedar and Hardie Stria cladding, four bedrooms, and high-end interior finishes. The exposed site called for balustrades that could handle wind and salt air without compromising the view, so NZ Windows Whitianga, an authorised UNEX fabricator, specified the UNEX Siena Framed Glass Balustrade. Clear toughened glass and powder-coated aluminium framing gave the strength needed for marine conditions, and a face-fixed installation kept the footprint minimal. The build hit early setbacks from severe weather and a temporary road closure, but NZ Windows Whitianga managed the fabrication, PS1s, and site-specific adjustments to deliver a fully compliant, on-design result just weeks behind schedule.

Completed
2025
0h 34m

Like this Project?
Hire UNEX Systems

UNEX Systems

unex.co.nz

Visit the UNEX Systems website for more of their work and how they like to work.

Visit Website

The products behind the project

One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Professionals used in
this project

The practices and trades credited on this project.

UNEX Systems
UNEX Systems
UNEX SystemsManufacturers and Suppliers

Next Project

Keep scrolling
Cook Drive, Whitianga - Frameless Glass Balustrades for a Coastal Home