The new building is the largest infrastructure development program undertaken for the Clayton Campus and was designed by John Wardle Architects; well-renowned for their work on iconic projects such as the Westfield Sydney Commercial Tower, Melbourne Conservatorium of Music and 900 Ann Street, Brisbane. Paying homage to the history of the Clayton site, the design encompasses the changes in theme over time; as indigenous bushland, colonial farmland, suburban subdivision and finally a university campus.
Construction of the 30,000sqm facility was awarded to Multiplex Builders and has sustainable design and construction at its core, gaining a 5-star rating from the Green Building Council of Australia. With a build cost of $220 million, Multiplex enlisted ARC Plastering for their knowledge, expertise and capability to provide a high-quality fit-out within the time constraints of the project. With up to 150 interior contractors on site at the construction peak, ARC Plastering thrived on this dynamic and exciting project.
As a Design and Construct project, the modern architectural elements of the design-led Multiplex and ARC Plastering to seek out Studco Building Systems® as their wall and ceiling systems manufacturer, to work in partnership with and provide innovative engineering solutions and dedicated technical advice throughout the sometimes challenging project.
Studco® wall and ceiling systems were used throughout the construction of the Learning and Teaching Building and the Studco engineering team worked with Multiplex and ARC Plastering to provide the optimal structural framing systems were used for each section of the build.