Skip to main content

Wellington Hospital

Wellington Hospital

CCM Architects

CCM Architects logo
  • 38.9K profile views
  • 2 saves
Visit Website
Regional Hospital project included the demolition of old but operational buildings on the main part of the site on Riddiford Street, the concurrent design of a large extension at Kenepuru Hospital in Porirua, and then the construction of the main hospital facility in Wellington. Read more
Visit Website

Project team

Product Suppliers

Wellington Regional Hospital features a low-rise design with a full basement carpark, extensive patient wards, and a focus on light and views, seamlessly integrating with its residential surroundings while ensuring operational efficiency and seismic safety.

Regional Hospital project included the demolition of old but operational buildings on the main part of the site on Riddiford Street, the concurrent design of a large extension at Kenepuru Hospital in Porirua, and then the construction of the main hospital facility in Wellington. 

The new hospital is relatively low rise with a full basement carpark; reception and ambulatory services on the ground floor; theatres and support on the next podium floor and wards and Womens services on the 5 floors above. The building relates strongly to its residential neighbourhood and is welcoming and airey. The main operational floor is very large with resulting excellent adjacencies between departments. Above, wards are specifically designed to be afford views and light to all patient rooms and to also be highly efficient for the staff. The whole building is seismically base isolated, and links directly to adjacent buildings at several levels. The project received the NZ Property Council Excellence Award in 2010.

5.2K5h 26m

Like this Project?
Hire CCM Architects

CCM Architects

ccm.co.nz

Visit the CCM Architects website for more of their work and how they like to work.

Visit Website

The products behind the project

Three products specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Professionals used in
this project

The practices and trades credited on this project.

CCM Architects
CCM Architects
CCM ArchitectsArchitects
Thermosash
Thermosash
ThermosashManufacturers and Suppliers
BR Flooring LTD
BR Flooring LTD
BR Flooring LTDFlooring Installers

Next Project

Keep scrolling
Queenstown International Airport