Skip to main content

Dated Home Renovation

Dated Home Renovation

Superior Renovations

Superior Renovations logo
  • 198.3K profile views
  • 115 saves
Visit Website
Our client had just bought an older house in Half Moon Bay and wanted it finished before she moved in. Read more
Visit Website

A dated Half Moon Bay house reworked before its new owner moved in: custom kitchen, ensuite and guest bathroom, a garage laundry, and new paint and tile right through. Work began in August 2020 and carried on through Level 3 lockdown.

Our client had just bought an older house in Half Moon Bay and wanted it finished before she moved in. She had a fixed budget, no previous renovation experience and very little spare time, so she was after one company to handle design, trades and scheduling. She compared six quotes and chose us after meeting project manager Jimmy Zhou.

Work started in early August 2020, just ahead of Auckland's second lockdown. The crew kept going under Level 3 rules and held the programme, which the owner could check for herself from her place across the road.

The biggest change was the kitchen. We took out the wall between kitchen and dining, then designed new cabinetry around the arched doors and windows found throughout the house. A flat handleless kitchen would have looked wrong against those curves, so the shaker-style Melteca doors have a vintage-pattern Dezignatek Thermoform wrap and are finished with dull black handles. A 30mm marble-look engineered stone bench and a Blanco Silgranit sink sit on top.

When the carpet came up, the lounge floor turned out to be off level. We showed her the problem, re-levelled it and adjusted the quote for that work only.

Scope

  • Wall removed between kitchen and dining; custom kitchen with Blum and DTC soft-close hardware and an induction cooktop
  • Walk-in wardrobe opening into a master ensuite with a custom double vanity and frameless tiled shower
  • Guest bathroom with a single vanity and a bath
  • Wet areas membrane-sealed before tiling
  • Laundry nook built into the garage, with plumbing and electrical redone
  • Wallpaper stripped from the high ceilings and walls using internal scaffolding, then a full repaint
  • Carpet replaced with oak-look tile through the living areas and bedrooms; stairs re-carpeted
  • Lounge floor re-levelled

Jimmy Zhou ran the project with our design team, and the house was handed over in October 2020.

Full case study: Full Home Renovation in Half Moon Bay, Auckland

Completed
2020
Price range
$0 - $0.25m
Building style
Contemporary
1730h 50m

Like this Project?
Hire Superior Renovations

Superior Renovations

superiorrenovations.co.nz

Visit the Superior Renovations website for more of their work and how they like to work.

Visit Website

Professional Reviews

1 / 7

“The Superior Renovations Team completed the renovation of our family bathroom and Powder room on budget for our time and money). On a daily basis they arrived on time and cleaned up after themselves after the day's work. These factors made it our expereince so easy. The end result is a spectacular bathroom and powder room that we are happy with. I do not hesitate to recommend Superior Renovations for your bathroom renovation".”

Jason Jia (A&T Professionals)Auckland

Professionals used in
this project

The practices and trades credited on this project.

Superior Renovations
Superior Renovations
Superior RenovationsHome Renovations

Next Project

Keep scrolling
Gold and Walnut Two-Bathroom Renovation in Massey, Auckland