Project team
- Hierarchy Group
- Ashley Bing Photography
Laing Headquarters: A state-of-the-art facility featuring a 1200m2 warehouse and modern office spaces, designed to enhance collaboration and efficiency for Laing's manufacturing and renovation operations, completed in 2024.
The Laing Headquarters is a new facility on 2 hectare site which consists of over 40 individual building sites for new build properties plus spaces for renovating the relocatable homes & wash down facilities. The large 1200m2 warehouse & office spaces have been designed to serve as a central hub for both Laing properties who are a leading manufacturer of residential and prefab transportable houses and a renowned specialist in re-locating & renovating second hand buildings. Situated on the outskirts of Rolleston, this facility integrates a warehouse for efficient material storage & production and a modern office building, promoting connectivity and collaboration within all aspects of the business. The warehouse component of the Laing Headquarters is designed to streamline the manufacturing process and features a spacious layout to efficiently accommodate the assembly of modular components. The on-site office building is strategically integrated with the warehouse to facilitate communication between production and administrative teams, optimising workflow and ensuring a smooth production process. The building’s design utilises clean lines, a sleek façade, and a blend of metal and Lunawood cladding, contributing to a visually appealing entrance that departs from the conventional warehouse building. Emphasis is placed on natural light and ventilation, creating a comfortable and energy efficient environment for the occupants. A contemporary and ergonomic office layout is adopted, creating a flexible work environment for the staff. This includes private offices, collaborative spaces, meeting rooms, and breakout areas designed to enhance employee well-being and productivity. Hierarchy Group assumed the roles of lead Designer, Quantity Surveyor and Project Manager on site, overseeing the Design of all trades & Site Management. This project was delivered within the original target construction programme with a high attention to detail from all trades.
- Completed
- 2024
Like this Project?
Hire Hierarchy Group
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Hierarchy Group
Other work by Hierarchy Group, across every category they build in.
More in
Factories and Warehouses
Everything else in Factories and Warehouses, from every practice on ArchiPro.
Next Project
Keep scrolling
















