By PJM Project Management
Te Ara is a modernisation of Emerge Aotearoa’s existing property portfolio with the demolition of the existing 1950’s flats and replacement with 18 purpose built one-bedroom units.
The nameTe Ara was gifted by Tainui and came from turning the waka upside down and having the keel representing the ridgepole of a house.
Inspired by the rich cultural context of Ōtāhuhu, where "ō" signifies 'place of,' and "tāhuhu" alludes to the 'ridgepole of a house.' This buildings form was influenced by the Tainui canoe journey from the Tāmaki River to the western seaboard, crossing a low ridge likened to the ridgepole of a house.
Each of the one-bedroom units are 50m2. Four units on the ground floor are designed to be accessible for disabled individuals, enabling residents to live independently and securely regardless of physical capability.
Acting as client-side project manager and Engineer to Contract, PJM provided project management and contract administration services during the design, procurement, and construction phases of the project.
Completed Date: 2023
PJM Project Management are an independent project management team established in 2008 based in Auckland, New Zealand.
At PJM, we specialise in creating lasting client relationships through our comprehensive turn-key project management services. We have a proven track record across corporate, residential, community housing, and government sectors. Our client-focused approach ensures reliable results by handling every aspect of your project - time, cost, quality, and safety - providing a trusted and seamless experience.
YOUR VISION, FOCUSED.