Hamilton Road Bathroom - Eye for Detail | ArchiPro

Hamilton Road Bathroom

A leak in our clients shower was what lead to this project coming to life. We tore out the existing retro-fitted bathroom, which had lasted 30 years since it's previous renovation. Regardless of the leak, the bathroom was tired and crammed - the perfect opportunity to make the space more comfortable and useable.

75% of the existing bathroom was sitting on a floating floor, so by lowering the floor back down and dropping the plumbing below the concrete slab, we were able to give the entire space more... space.

Visit professional's website
Enquire about the process / fees
Contact details

Professionals used on this project

Also from Eye for Detail