Cost control is often treated as something that happens after the design is complete. A project comes in over budget, the drawings are reviewed and the architecture is gradually reduced through a value management cost-cutting process. Rooms are cut. Materials are swapped. Details are simplified. What began as a clear idea can become a series of compromises. Leaving homeowners and architects traumatised.